Hospital Authority Hong Kong Hospital Authority

No Record
No Record found for

Search Result(s)
Record found for

Close
Redevelopment of

Queen Mary Hospital, phase 1

The Concept Plan for phase 1 redevelopment and conversion works of Senior Staff Quarters
Phase 1 of the redevelopment of QMH involves constructing a new hospital block at the north end of the hospital campus that has large floor plates with convenient connections between the A&E Department, Intensive Care Unit, Operating Theatres and emergency diagnostic facilities, so as to strengthen emergency services for critical patients.

To minimise disruptions to clinical services during redevelopment, it is necessary to decant the existing services in the Clinical Pathology Building, University Pathology Building and facilities of the Housemen Quarters to the converted Senior Staff Quarters.

BeforeAfter

Converted Senior Staff Quarters (Block T)
Block TLecture Hall
AtriumLaboratories

Link Bridge
A new link bridge will join the existing one at the New Clinical Building, forming an all-weather walkway between Block T (the converted Senior Staff Quarters) and other buildings in the hospital campus.

The air-conditioned new link bridge of about 2.7-meter wide provides a generous and comfortable passage for healthcare staff, students and visitors. The gradient is kept to a minimum to enable safe and smooth transportation of pathology specimens.