The scope of the project comprises:
- Construction of a new hospital block erected over the slope on the east of the existing main block for re-provisioning of 116 infirmary beds from the three existing hospital blocks, providing 160 additional extended care beds, accommodating a day medical and rehabilitation centre (DMRC) and an integrated carers’ support centre (ICSC)
- Demolition of the three existing hospital buildings which accommodate all infirmary wards at HHH.
- Construction of two pedestrian link bridges between the new hospital block and the existing main block.
- Building services and structural provisions in the new hospital block to cater for future vertical extension.
- Alteration and addition works to areas in the existing main block which will be affected by the construction of the two pedestrian link bridges.
- Provision of associated external and landscaping works.
The project was completed in 2023.